We are very happy with the way it turned out. The dark floor completes the look we were going for. I should mention that this is in the basement so we put down a dri-core sub floor and then a cork under pad with a vapour barrier before the laminate when down. This should provide significant protection from the concrete floor in terms of temperature and moisture. I have a bit more work to do in the closet and the built in toy shelves. Hopefully in a few months we can work on some trim and baseboards.
The above picture is the hallway leading from the office to the main part of the basement. The stairs coming down are just to the left. I thought it might be fun to remind everyone how things look before we got started.
I am thinking that we have some improvement, the kids are very excited to bring the TV and the Wii back downstairs. I need to remember to schedule the final electrical inspection this week.
Thanks for following this project.
You did a nice job. It looks really good
ReplyDelete